<div dir="ltr"><div class="gmail_default" style="font-size:small">Hi All,<br><br></div><div class="gmail_default" style="font-size:small">Looks like I missed mailing these out, sending now for record keeping.</div><div class="gmail_default" style="font-size:small"><br></div><div class="gmail_default" style="font-size:small">November 5, 2020<br><br>#########################################<br>Attendees<br>#########################################<br><br>1. Lincoln Lavoie<br>2. James Hendergart<br>3. Thomas Monjalon<br>4. Brandon Lo<br>5. Gal Cohen<br>6. Ruxiang Wang<br>7. Honnappa Nagarahalli<br>8. Juraj Linkes<br>9. Zhaoyan Chen<br><br>#########################################<br>Agenda<br>#########################################<br><br>1. CI Status<br>2. Test Development<br>3. Any other business<br><br>#########################################<br>Minutes<br>#########################################<br><br>=========================================<br>CI Status<br>=========================================<br><br>-----------------------------------------<br>General<br>-----------------------------------------<br><br>* BUG-210 (Patches with dependency fails to apply): Syntax is now official in the documentation, should be possible to update the script to look for / parse this information.<br>   * UNH-IOL will look into implementing this, either in git-pw or as a wrapper to that.<br>* BUG-511 (Add check if performance tests are needed): This can also be implemented to avoid running unnecessary testing.<br>   * UNH-IOL will look into implementing this.<br><br>-----------------------------------------<br>Travis CI / OBS<br>-----------------------------------------<br><br>* No updates<br><br>-----------------------------------------<br>Intel Lab<br>-----------------------------------------<br><br>* No issues, running for 20.11 release.<br>* Need to extend the coverage if possible to add more devices / drivers.  This would have caught a recent failure within the testpmd component, if additional drivers are being checked.  Zhaoyan will discuss internally and come back with a proposed plan.<br>* Intel is planning to add test cases to the UNH-IOL hosted hardware for crypto and virt-io.  Lincoln to work with Zhaoyan on this plan and report back to the group.<br><br>-----------------------------------------<br>UNH-IOL Community Lab<br>-----------------------------------------<br><br>* Seeing some apply errors as the branches change rapidly with the 20.11 release prep.  We’ve been watching and manually selecting the branch where possible for these cases.<br>* Working on reliability with DPDK unit testing script<br>   * <a href="https://bugs.dpdk.org/show_bug.cgi?id=566">https://bugs.dpdk.org/show_bug.cgi?id=566</a> <br>* Making changes to meson compile to reduce amount of false failures reported on the dashboard<br>* Investigating issue with patch sets not being picked up by the server<br>* ARM hardware still being set up with DTS/TREX<br>* Working on migrating rte_flow functional test into production systems<br>* Reporting format<br>   * Desire to have the last N lines of the console log included in the email report, this will make it easier to debug quickly.  We’ll file a bug on this item to track this.  Plan to launch this after the 20.11 release is completed. (See BUG-569).<br><br>=========================================<br>Test Development<br>=========================================<br><br>* rte_flow was completed and merged into the DTS main branch.<br>* Future Work<br>* DTS Feedback - Some initial (rough draft) user and developer feedback has been captured here: <a href="https://docs.google.com/document/d/1c5S0_mZzFvzZfYkqyORLT2-qNvUb-fBdjA6DGusy4yM/edit">https://docs.google.com/document/d/1c5S0_mZzFvzZfYkqyORLT2-qNvUb-fBdjA6DGusy4yM/edit</a>  Tech board is looking into DTS as a priority for 2021, and this feedback is extremely valuable to that process.  Please contribute! A lot of the devs are very busy with the 20.11 release, so we’ll keep reminding this over the next few meetings, so we don’t forget.<br><br>=========================================<br>Any other business<br>=========================================<br><br>* Next Meeting: November 19, 2020<br></div><div><br></div>-- <br><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div><b>Lincoln Lavoie</b><br></div><div>Senior Engineer, Broadband Technologies</div><div>21 Madbury Rd., Ste. 100, Durham, NH 03824</div><div><a href="mailto:lylavoie@iol.unh.edu" target="_blank">lylavoie@iol.unh.edu</a></div><div><a href="https://www.iol.unh.edu" target="_blank">https://www.iol.unh.edu</a></div><div>+1-603-674-2755 (m)</div><div><a href="https://www.iol.unh.edu" target="_blank"><img src="https://docs.google.com/uc?export=download&id=1j_iI6anwrnbQWNpTyuvukMLSNJJ8_8QU&revid=0B_0ujwABDnFZTmJiR3EzK0d1VjFKTjQvMENBWVM0QnA4ajhjPQ" width="200" height="43"></a><br></div></div></div></div></div></div></div></div></div></div></div></div>